1 / 5
June Power
| Customization: | Available |
|---|---|
| Nominal Voltage: | 2.4V ~ 1000V |
| Warranty: | 2 Years+ |
This project connects the energy storage system to the AC voltage (400V) bus. The main role of an energy storage system is to accumulate energy for self-consumption or peak-price power system sales.
System Configuration: The 0.5MW/1.075MWh system consists of 5 battery clusters connected to a 500kW PCS via a DC combiner cabinet. The AC400V output is connected through an isolation transformer.
| Project | Rated Voltage | Capacity | Energy | Group Approach |
| Battery Cell | 3.2V | 280Ah | 0.896kWh | / |
| Battery Box | 51.2V | 280Ah | 14.336kWh | 1P16S |
| Battery Clusters | 768V | 280Ah | 215.04kWh | 1P240S |
| Storage Systems | 768V | 5*280Ah | 1075.2kWh | 5*1P240S |
| No. | Parameter Item | Specification | Remark |
| 1 | Thermal Management | Air-cooled | 30kW Cooling Power |
| 2 | Communication | CAN/RS485 | - |
| 3 | IP Rating | IP54 | Container Level |
| 4 | System Size | 6096×2438×2896mm | 20' High Cube |
500kW bidirectional converter featuring STS quick transfer switch and isolation transformer. Supports automatic operation with high visualization through an industrial touch interface.
Three-level management structure (module, cluster, system) for comprehensive control and safety. Includes overcharge, overdischarge, and short-circuit protection.